Less to coordinate on site
Water-cooled systems need no ventilation grille and no clearance zone, which takes a coordination item off both the joinery and the M&E drawings.
Systems, specification packs and lead times built around a construction programme. Support for Cat A and Cat B fitout, refurbishment and new build.
Why fitout teams choose Billi
The system that causes the fewest problems on site is the one that leaves the client happiest at handover.
Less to coordinate on site
Water-cooled systems need no ventilation grille and no clearance zone, which takes a coordination item off both the joinery and the M&E drawings.
Straightforward commissioning
Above- or below-bench installation with a self-commissioning function, so handover does not hinge on a specialist visit.
Spec packs that survive value engineering
Drawings, data sheets and finish schedules issued up front, so the system that gets installed is the one that was specified.
Aftercare the client keeps
Nationwide engineers and BilliCare plans mean the client inherits a supported system, not a snag.
Specified on fitouts like yours
Sized by the floor they serve, with finishes to match the joinery schedule.
Serves up to 60 people
Billi Quadra Plus 9
The standard specification for a fitted-out floor: boiling and chilled water with a matching mixer tap at the sink.
Serves up to 60 people
Billi Quadra Sparkling Plus 9
Adds filtered sparkling water where the space has to impress as well as function.
Serves up to 100 people
Billi Quadra Plus 15
The highest-capacity Quadra, for shared amenity floors and buildings serving several tenants.
For the project team
Delivered with contractors and design-and-build teams
Fit-out and refurbishment contractor
Two Quadra Plus 9 systems in matte black with matching drainage fonts and paddle mixer taps at their King William Street headquarters.
Office design and build
Billi specified and installed as part of a design-and-build workplace project.
Global workplace design and delivery
Instant filtered water delivered into a workplace project from specification through to handover.
Fitout and construction FAQs
A mains water supply and a power socket. Because the systems are water-cooled rather than air-cooled there is no ventilation grille, no cooling fan and no clearance zone to coordinate, which is usually the detail that surprises teams switching from another brand.
Yes. Tell us the handover date early and we will confirm lead times and schedule installation around the programme rather than after it.
Billi’s own engineers install nationwide. The system arrives with a self-commissioning function, and our engineer completes commissioning and demonstrates the system at handover.
More than ten, including chrome, brushed, matte black, matte white, rose gold and urban brass, with matching drainage fonts and mixer taps. Physical samples can be posted before you commit.
A 24-month warranty as standard, plus the option of a Combi 3 or Combi 5 plan taken out within six months of installation, covering maintenance, parts and labour for three or five years.
Send us the programme and the drawings, and we will come back with lead times, finishes and a spec pack.
Rather talk it through? Call 020 7456 6789.